When you get the call
- Make sure the water is off: at the house shut-off and, if needed, at the meter.
- Do not switch power back on if water reached the panel, outlets or ceiling fixtures; have an electrician check first.
- Photograph and video every room before anything is moved.
- Secure the property: lock doors, and board any broken windows.
If the city or water utility shut off service because of the leak, ask them what is needed to restore it; usually a plumber has to repair the leak first.
Vacancy and insurance
Many homeowners and landlord policies limit or exclude water damage if the home has been vacant for a set period, often 30 or 60 consecutive days, unless the heat was kept on or the water was shut off. Read the vacancy clause before you call, and tell the insurer the facts as they are. An inherited house may need the policy changed to the estate or new owner's name.
Drying a house that sat wet
Water that sat for days in a closed house is treated as more contaminated than a fresh leak, and mould may already be growing. Expect more material to be removed: carpet and pad, lower drywall, insulation, and cabinets that swelled. The restoration company will map moisture through the whole house, not only the rooms where the leak was, because water travels under walls.
Preventing a repeat
For a home that will stay empty, shut off the water at the main and drain the lines, or keep the heat on during freezes and have someone check weekly. Smart leak sensors and an automatic shut-off valve are worth the cost on any unoccupied property.
Common questions
Who is responsible if a tenant had just moved out?
It depends on the lease and on when the damage happened. Document the condition and the date you found it, and let your insurer and attorney sort out responsibility.
Should I turn the water back on to test it?
Only with a plumber present after the leak is repaired. Turning water on in a house with an unknown break can repeat the flood within minutes.
How long will drying take?
Longer than a fresh leak, because materials have soaked for days. Expect several days of equipment and possibly more demolition if mould has started.
